Friday, 20 January 2012

Production Scedule

Production Schedule Title of Media Project: First Two minutes Of a Thriller Production by: SMC Productions
Date: 10-3-12
Time:
12- 3 pm
Activity:
Filming
Location:
Ashley Rd., Islington.
People Required
Props/Equipment
Required
Other Items (or a To Do List)
10-3-12
12:00-12:45
Bathroom Scenes.
Bathroom, Victorian house on Ashley Road, Islington.
Comfort Botha, Jessica Ansah.
Equipment: Camera, Tripod, Mirrors to direct the sunlight.
Props: costumes and the pregnancy test for Comfort Botha.
Shots we most achieve:
P.O.V, C.U, Mid.S
Costumes: Comfort needs stay-at-home clothes, same for Jessica, as they will be in their home.
10-3-12
12:45- 1:00pm
Break
10-3-12
1:00 – 1: 30
Water breaking and pregnancy Scene
Living room, Victorian house on Ashley Road, Islington.
Comfort Botha
Equipment: Camera, Tripod.
Props: Towels and costume, glass of water (to create the water breaking).
Shots we must achieve:
P.O.V, C.U
Costumes: Long black maxi dress to show baby bump. Towel robe for actual water breaking.
10-3-12
1:30- 3:00
Consequent scenes. They are all with the same costumes.
Living room, bedroom, Victorian house on Ashley Road, Islington.
Comfort Botha, Jessica Ansah
Equipment: Camera, Tripod
Props: costumes e.g. coat, bag, work shoes for Comfort Botha and the ‘baby’ which was created with sweaters
Shots:
P.O.V, C.U to build tension. Static shots with tripod. No zooms
Costumes:

By doing a production schedule helped my group maintain our time managaments within the time we were shooting. This was very useful becuause we were more aware of what time we would be doing certain shots and the type of shots we were actually doing. This also kept us up to date by setting certain targets for ourselfs; we knew when we had to complete it. At first we found hard to create this but after looking at an production scedule template it was then easy to create our owns.  